ÑÇÖÞÌìÌÃ

Skip to content

Water-main-tie construction

Construction work of a larger diameter water line was installed on Francois Lake Drive also known as Highway 35 at ÑÇÖÞÌìÌà Lake on Oct. 5. For a whole week, the access to Highway 35 intersection off of Highway 16 was closed. The required water-main-tie was built for the new fire hall and it is now completed. (Saddman Zaman photo/Lakes District ÑÇÖÞÌìÌÃ)
34128317_web1_231011-LDN-Construction-On-Highway-35-Photo_1

Construction work of a larger diameter water line was installed on Francois Lake Drive also known as Highway 35 at ÑÇÖÞÌìÌà Lake on Oct. 5. For a whole week, the access to Highway 35 intersection off of Highway 16 was closed. The required water-main-tie was built for the new fire hall and it is now completed. (Saddman Zaman photo/Lakes District ÑÇÖÞÌìÌÃ)





(or

ÑÇÖÞÌìÌÃ

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }