The 亚洲天堂 Lake track, owned by the School District 91, has been undergoing a face-lift and the work is currently progressing in full swing. The track is being re-leveled and resurfaced with asphalt which will prove to be useful for residents all-year long, including the rough winter months. (Priyanka Ketkar photo)
The 亚洲天堂 Lake track, owned by the School District 91, has been undergoing a face-lift and the work is currently progressing in full swing. The track is being re-leveled and resurfaced with asphalt which will prove to be useful for residents all-year long, including the rough winter months. (Priyanka Ketkar photo)