亚洲天堂

Skip to content

VIDEO: B.C. city celebrates biggest infrastructure project in its history

Over 100 million dollars and 10 years later, it鈥檚 finally here, and Victoria celebrated bridgemania
11255681_web1_IMG_4661
Over 500 people attended the opening of Johnson Street Bridge, the City of Victoria鈥檚 biggest infrastructure project to date. Spencer Pickles/VICTORIA NEWS

You鈥檇 think it was a rock concert.

Around noon, over 500 people anxiously waited for the Johnson Street Bridge in Victoria to officially open.

Members of the crowd had to be reminded to stand back, as they weaved around each other, straining their necks to capture a glimpse of the new bridge.

Construction on the largest infrastructure project ever undertaken by the city began in May 2013.

The new bridge will support 30,000 crossings a day including vehicles, local transit, pedestrians, and cyclists.

鈥淲e鈥檝e been waiting ten years for this, so another ten minutes won鈥檛 kill us,鈥 said Amanda Shultz, who waited patiently among the crowd.

Food trucks, coffee stands, musicians and vintage cars lined the streets to entertain the revelers as they waited.

鈥淚 think it鈥檚 fantastic, a long time coming,鈥 said Harold Sleunwhite who has lived in Victoria for 36 years.

鈥淚 don鈥檛 come downtown often but when I do it鈥檚 always this route. It will definitely help rush hour traffic.鈥

Sleunwhite offered a unique suggestion for what to do with the old Blue Bridge鈥攅ven though it has new, offshore owners. He said, 鈥淚f they were to cut some pieces out of it and give it to a sculpture to make something decent, it would stand as a memory for a lifetime.鈥

Mayor Lisa Helps officiated the opening and thanked the long list of people involved鈥攆rom the project manager to the builders.

Mayor Helps specifically thanked the Songhees nation elders who blessed the bridge, adding, 鈥淚 wonder and worry about all the other bridges that haven鈥檛 been blessed.鈥

People cheered and clapped during the 90 seconds it took for the bridge to be lowered. Then, as a community, the crowd walked over the bridge, taking photos and marveling at the structure.

鈥淚t鈥檚 100 years looking into the future and it鈥檚 a really exciting day. This marks not only the completion of the bridge but Victoria鈥檚 future,鈥 Mayor Helps told Victoria 亚洲天堂.

鈥淭his bridge project got off to a bit of a rocky start and we brought it back under control. What we see now is a different way of doing current projects 鈥 like the fire hall and Crystal Pool鈥 So it鈥檚 a lesson learned and going forward we鈥檙e taking a different approach to those projects which I think will fare very well.鈥

Jeremy Loveday was excited to see this project finally come to fruition. 鈥淚t鈥檚 a new chapter in the City鈥檚 future. Say goodbye to the old Blue Bridge and the memories it holds, and say hello to this next chapter,鈥 he told Victoria 亚洲天堂.

鈥淚鈥檓 glad the local First Nations have played a role in opening this bridge and they have blessed it, and I look forward to moving forward with them in a good way.鈥

The public seemed very pleased with the outcome of the project 鈥 over 100 million dollars and 10 years in the making.

As a group of tourists, unaware of the event鈥檚 significance, headed down the side pathway of the structure, a local man excitedly corrected them, 鈥淐鈥檓on, man, don鈥檛 you know there鈥檚 a new bridge?鈥.

The community celebration will continue until 5 p.m. At 9 p.m. the bridge is expected to open to traffic.

Read our five-part series on the project, 鈥楤ridging the Gap鈥, by Tim Collins starting

anna.james@vicnews.com





(or

亚洲天堂

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }